Skarta Clean Energy

Our future lies in wind and solar energy and the storing of these. We are building a clean future through realising projects in energy production that use emission-free technology.

We focus on the realisation of wind and nuclear power projects in collaboration with industrial companies and public associations. In Finland, we are a leading builder of wind farms, and we have participated in the building of more than 100 wind farms since 2013. In the Finnish Hanhikivi 1 nuclear power project, we have acted as contractors for a demanding contract in the preparatory work.

It is our aim to expand our business in the value chain for renewable energy against Balance of Plant (BoP) deliveries and carrying out entire projects. In our entirety projects, we develop, plan, realise, own and maintain technologically advanced energy-producing plants in the Nordic countries.

BoP construction

Balance of Plant construction refers to infrastructure and electrical work at a wind farm. The BoP construction includes everything except turbines.

We are involved in wind farms through our Balance of Plant concept which covers the construction of the necessary roads, lifting areas and foundations, as well as underground cabling and transformer deliveries, which are needed for joining the electricity grid.

Building a road 

In order to get the machines, supplies and equipment on site, every power plant project starts with the construction of a road.

Lifting areas

Well-designed and efficiently implemented lifting areas allow the smooth implementation of the next stages of the project.

Foundations

The construction of foundations is one of the most demanding tasks of wind farm construction. The soil of the site must be taken into account, as well as the size of the power plant.

Electrical work

Underground cabling’s share of the costs is relatively small, but even more important – the electricity produced must be transferred undisturbed via the substation to the national grid.